Bill of Quantities (BOQ)
Accurate BOQs for Smarter Budgeting

Measured work, with the assumptions written down
A take off is only as reliable as the assumptions behind it. Every drawing set is silent on something, and every measurer makes judgement calls to fill those gaps. The difference between a useful bill and a disputed one is whether those calls were recorded or left in someone's head.
We work systematically through the set by element, with descriptions precise enough that every contractor prices the same thing. The description matters as much as the number, since a quantity without a proper description invites interpretation and produces tenders you cannot compare.
What you receive
- Itemised quantities measured by element and trade
- Descriptions written for consistent pricing
- A documented assumptions list covering everything the drawings did not state
- Take offs against a stated drawing revision, so the basis is never in doubt
- Model derived quantities where modelling discipline supports it, checked against the drawings rather than trusted blindly
Why the assumptions list matters
Most quantity disputes trace back to something nobody wrote down. Supplying the assumptions alongside the bill lets you correct anything we read differently from your intent, before it becomes a claim during construction. It is the most useful page in the deliverable and the one most often missing.
Key features
and activities.
Detailed Quantity Take-offs
Itemized Cost Estimation
Tender Documentation Support
Material and Work Segregation
Budget Planning and Cost Control
Updates for Design Revisions
Explore more services.
Send us a set.
Get one back, better.
Request a sample
Tell us about your project and we will send across a sample set.



